 |
|
|
|
Home » Products » Infrared Sauna Pro-Health II » Easy Installation
Infrared Sauna Model Pro-Health II |

$2,495.00 |

 |
Step 1
Place
the bottom board in the desired location of your sauna. The sauna will be
assembled on top of it. Then place
the front panel with door (section 3) on the front of the bottom panel. |
|
 |
Step 2
Place
the left side wall (section 7) on the bottom, lift it in order to make the
two pieces of pothooks lock on the corresponding slots on the front panel,
then put it down; after that, fix the left side wall with bottom panel by
the special latching system. |
|

 |
Step 3
Locate back
wall (section 8) and attached to the left side wall section 7) with the
special latching system. Locate
right wall on the bottom panel, lift it to make its pothooks lock on the
corresponding slots of the front wall, then press it down securing the wall
in place; after that, secure it to the back wall by latching system on the
other side. |
|
|
Step 4
Locate bench
front with heating element and slide it down vertically into the slot
located on the inside wall. Next, connect the bench's heater element wire
to corresponding wire from the back wall, then locate seat top (section
6) and slide into place.
|
|

|
Step 5
Locate the
wall panel wiring and drape outside the completed unit to make room for
installation of the ceiling. These wires will be flipped back after the
ceiling is in place. Then connect before the roof panel is put on.
Locate section
9 (ceiling panel), rise above the walls and set in place to complete the
enclosure. The ceiling should fit easily.
Flip the
wall panel wiring back over the top of the ceiling and recheck all latches
to make sure all walls are latched together correctly and tightly .And
cotter pins have been installed. |
|
 |
Step 6
Unpack the
CD player and Faceplate control from the box. Plug audio wire (CD2) from
the Power Board into the back of the CD player. Locate the control panel's
main wire A from the Power Board, and attach to the back of the external
control panel. Attach the internal control box to the small batten under
the CD box .
|
|
 |
Step 7
Place the
internal top ceiling (section 9) on the completed sauna room to cover
all internal wiring.
Congratulations!
The installation is completed.
|
|